Menya & Sohag Recycling Facilities – Design Review & Construction Supervision

Client:

Waste Management Regulatory Authority (WMRA), Ministry of Environment, Egypt

Technical design review and construction supervision of two municipal solid waste recycling facilities in Menya and Sohag Governorates, Egypt.

Project Overview

The assignment involved the technical review of the detailed designs for two MSW recycling facilities comprising four treatment lines. Each facility included waste reception and sorting areas, shredding/chopping units, composting and maturation areas, and supporting administrative, storage, and maintenance infrastructure.

Our Role

  • Served as Main Consultant for design review and construction supervision.
  • Reviewed and validated structural, architectural, mechanical, electrical, and plumbing designs.
  • Identified and resolved technical and functional design deficiencies.
  • Developed and implemented a project-specific Construction Quality Assurance (CQA) Plan.
  • Monitored construction materials, equipment installation, and finishing works.
  • Verified compliance with approved designs, project specifications, and applicable standards.
  • Prepared progress reports, photographic documentation, and testing records.

Key Impact

  • Improved the technical functionality and operational efficiency of both facilities.
  • Strengthened construction quality and compliance through systematic technical supervision.
  • Supported the development of modern MSW treatment and material recovery infrastructure in Upper Egypt.
  • Enhanced the reliability and implementation readiness of the two recycling facilities.